Kidston BESS Project

The Kidston Stage-3 BESS Project (K3-BESS) is located in Kidston, Far-North Queensland, and will leverage existing infrastructure and co-location advantages from the Kidston Pumped Hydro Project. 

Kidston BESS Project

The K3-BESS is a dedicated energy storage project with a target capacity of 200MW and 800MWh. This configuration will further minimise environmental impact and contribute to improved energy reliability in the grid. The project will connect to the new 275kV transmission line recently built by Powerlink Queensland for the K2-Hydro Project. 

With the integration of renewable energy generation with the pumped hydro and BESS energy storage facilities, the Kidston Clean Energy Hub represents a unique, multi-technology renewable energy precinct. 

Project Status
Grid Connection

Grid connection arrangements progressed.

Approval Pathway

Securing remaining approvals. Community Benefits Agreement executed with Etheridge Shire Council.

Advancing Toward Construction

Preparing for construction, which will create local jobs and economic opportunities.

Location Advantages
Strong Existing Relationships

Existing relationship with community and project stakeholders.

Grid Stability

Grid-forming technology will improve grid stability in the region.

Existing Infrastructure

Accommodation camp, airstrip and solid road access.