The Bouldercombe Battery Project, located in Rockhampton, once in operation, will be one of the first standalone large-scale Battery Energy Storage Systems (BESS) in Queensland at an initial size of 50/100MWh (2hr storage depth).
Genex has signed a Connection Agreement with Powerlink to enable the project to connect into the adjacent 275kV/132kV Bouldercombe substation. The Project will connect into an available 132kV bay at the Bouldercombe substation, which is located in a key part of the Queensland electricity grid with good network strength and Marginal Loss Factor profiles.
Tesla has been selected as the battery integrator and supplier for BBP utilising the Tesla Megapack 2.0.

The Project will operate on an arbitrage/FCAS revenue model with the ability to bid into all eight existing FCAS markets, and to participate in future markets for inertia and fast frequency response which are currently under development.
The project is currently under construction with operations to commence before mid CY2023.